📘 Assignment Overview

This assessment is part of a series where you will learn project management step by step. Assessment 1 (20% of your marks) focuses on the planning phase. You need to:

  • Create a project schedule (Gantt chart)
  • Use project management tools and techniques
  • Evaluate how planning helps with cost estimation

All submissions must follow Open guidelines and be uploaded to the iQualify platform.

🎯 Learning Outcomes

By completing this assessment you will be able to:

  • Choose the project management tools and techniques
  • Create a structured project planning chart (Gantt chart)
  • Evaluate reporting and planning processes
  • Understand how scheduling helps with project cost estimation

🏗️ Project Scenario – NAP Student Accommodation Refurbishment

You are working as a trainee project manager at New Renovations Limited (NNR). You are now in charge of managing the refurbishment project.

📌 Project Details

  • 10 student villas need refurbishment
  • Each villa accommodates 8 students
  • Kitchens need upgrading
  • Floors require re-tiling and carpeting
  • Bedrooms and lounges need repainting and refurnishing
  • Bathrooms are already completed

⏳ Deadline

  • Project duration: 1 July – 24 July
  • Final deadline: Before 25 July (student return)

👉 This project is time-critical. Requires efficient planning and scheduling.

📊 Task 1 – Draft Project Schedule (90 Marks)

You must create a Gantt chart using the BSNS4603 WBS Excel template.

✔️ Key Requirements

  • Minimum 30 task entries
  • At 5 summary tasks with sub-tasks
  • Include:
    • Task IDs
    • Start and finish dates
    • Task durations
  • Task dependencies
  • At least 3 milestones
  • Critical path and key activities
  • Assume all tasks are at 0% completion

📌 Submission Guidelines

  • Present as a clear and readable Gantt chart
  • Ensure all tasks fall within the 1–24 July timeline
  • Maintain a format

🧠 Task 2 – Evaluation (10 Marks)

Write a short evaluation (about 150 words) explaining the usefulness of your project schedule.

🔍 You should discuss:

  • Planning methods used
  • Effectiveness of the schedule
  • Possible improvements
  • Role of scheduling, in cost estimation (Assessment 2)

📝 Submission Requirements

  • Submit two files
  • Include:
    • Name
    • Student number
    • Assessment number
  • Ensure all pages are numbered
  • Upload via iQualify (no email submissions)
  • You will receive an automated originality confirmation

🏆 Assessment Criteria

✔️ High-Quality Work Includes:

  • Accurate and detailed Gantt chart
  • Logical task sequencing and dependencies
  • defined critical path
  • Realistic timelines
  • Professional presentation

✔️ Evaluation Section:

  • Demonstrates thinking
  • Links planning with cost estimation
  • Provides insights

Frequently Asked Questions

It focuses on creating a project schedule using Gantt charts and evaluating planning techniques for cost estimation.

A minimum of 30 tasks with at least 5 summary tasks and 3 milestones is required.

The refurbishment must be completed between 1 July and 24 July before students return.

Students must upload their work via the iQualify platform, following Open Polytechnic submission guidelines.