Coordinate Activities Associated With The Leasing And Installation Of The RVM’s: Project Management Assignment, UCC, Ireland
Publish By:
Admin,
Last Updated:
21-Jul-23
Price:
$120
Project Deliverables
PM Deliverables:
- Coordinate activities associated with the leasing and installation of the RVM’s(e.g. connections to electrical sockets, data points, CCTV positioning)
- Draft and finalize procedures for equipment use (include risk assessments for equipment use)
- Generate a scoring list of potential vendors (system suitability, lead time, cost, ability to provide service contract post-installation)
- Identify all cost elements of the project and ensure formal corporate approval before commencing
- Modification to existing store layout to ensure suitability for the RVM’s
- Provide weekly updates in the form of a Highlight report to the project sponsor and stakeholders via email.
- Handover of equipment to Store Manager upon project completion (instructional documentation, equipment procedures)
Client Deliverables:
- Timely approval of potential vendors
- Respond on time to queries regarding equipment requirements during the selection process or issues as they arise (within 48 hours)
- Prepare for delivery of RVM’s to stores, space, and connection points made available for the RVM’s to be installed outside store opening hours.